Saturday, September 27, 2014

September Outside Projects

We completed 25 outdoor projects this month. We spent $60 on caulk, concrete supplies, paint, and mums. All our other projects were free.

Our Completed Project List for September:
  • pull out all old caulk and re-caulk outside 2nd floor windows of the house (multiple days of work)
  •  scrap/sand off the old paint on outside 2nd floor windows of house (multiple days of work) 
  • paint trim on the outside 2nd floor windows of the house (multiple days of work)
  • purge unneeded items from the shed (multiple days of work)
  • reorganize and clean the shed (multiple days of work)
  • fill cracks in concrete near Pete’s room 
  • repair sidewalks with concrete (multiple days of work)
  • sweep sidewalks and side porch 
  • sweep front porch 
  • pickup sticks in the yard 
  • weed the gardens (multiple days of work) 
  • pick vegetables in garden 
  • deadhead flowers 
  • remove grass/dirt overgrowth on the sidewalks in backyard and sideyard.
  • chop and stack firewood 
  • wash out the outdoor trash cans
  • pressure wash sidewalks
  • pressure wash house
  • dig compost pile 
  • buy and plant mums
  • Set up fall display 
  • repair van
  • cleaning treatment on car light covers
  • pick up black walnuts off ground in yard
  • painted 4 main doors and 1 wood screen door white

No comments:

Post a Comment

Thank you for visiting A Welcoming Heart. Your comments are always appreciated and I hope you feel welcome to share your heart with me.